Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. The maintenance instruction
+ 2. Maintenance service
+ 3. Engines
+ 3.2. Diesel engines
+ 3.3. Removal and a partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
+ 10. Brake system
- 11. Suspension brackets, a steering
   11.2. Technical characteristics
   11.3. The general description of adjustment of wheels
   - 11.4. A forward suspension bracket
      11.4.2. A rack of a forward suspension bracket
      11.4.3. Shock-absorbers of a forward suspension bracket
      11.4.4. The bottom lever of a forward suspension bracket
      11.4.5. The stabilizer of cross-section stability of a forward suspension bracket
      11.4.6. A cross-beam of a forward suspension bracket
   + 11.5. A back suspension bracket
   + 11.6. A steering
   + 11.7. Semiaxes
   11.8. Easily and easy
   11.9. Maintenance service of system of a steering
   11.10. Diagnostics of malfunctions of system of a steering
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice


9df16362

11.4.5. The stabilizer of cross-section stability of a forward suspension bracket Removal

PERFORMANCE ORDER
1. At removal of the stabilizer of cross-section stability the car should stand on the earth.
2. Turn off fixing bolts and clean a tube with wires aside if it is necessary.
3. Turn off fixing bolts and nuts of fastening of the stabilizer of cross-section stability to a body. Remove fastenings.
4. Turn off fixing nuts and remove washers and back plugs.
5. Remove the stabilizer of cross-section stability from the car.

Installation

Installation is spent upside-down removals.

PERFORMANCE ORDER
1. Establish plugs of fastenings on ободки the stabilizer of cross-section stability.
2. Establish fixing clips on plugs and acquire fixing bolts and nuts.
3. Tighten nuts of fastening of the stabilizer of cross-section stability to the lever of a suspension bracket till the demanded moment of an inhaling of a stage 1 and tighten and on a demanded corner.
4. Tighten nuts of fixing clips till the demanded moment of an inhaling.