Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. The maintenance instruction
+ 2. Maintenance service
+ 3. Engines
+ 3.2. Diesel engines
+ 3.3. Removal and a partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
+ 10. Brake system
- 11. Suspension brackets, a steering
   11.2. Technical characteristics
   11.3. The general description of adjustment of wheels
   - 11.4. A forward suspension bracket
      11.4.2. A rack of a forward suspension bracket
      11.4.3. Shock-absorbers of a forward suspension bracket
      11.4.4. The bottom lever of a forward suspension bracket
      11.4.5. The stabilizer of cross-section stability of a forward suspension bracket
      11.4.6. A cross-beam of a forward suspension bracket
   + 11.5. A back suspension bracket
   + 11.6. A steering
   + 11.7. Semiaxes
   11.8. Easily and easy
   11.9. Maintenance service of system of a steering
   11.10. Diagnostics of malfunctions of system of a steering
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice


9df16362 Кто может стать домовым

11.4.3. Shock-absorbers of a forward suspension bracket Removal

PERFORMANCE ORDER
1. Mark position of installation of the top support of the shock-absorber on a plate of the top fastening of a rack of a suspension bracket.
2. Turn off and remove a nut on a rod of the piston of the shock-absorber.
3. Turn off three fixing nuts and remove the top support of the shock-absorber.
4. Turn a steering wheel so that the rod of the piston of the shock-absorber was in the aperture centre on the top fastening of a rack.
5. Remove the adjusting plug of the shock-absorber and a rubber emphasis.
6. Turn off a fixing cap and remove it.
7. Remove the shock-absorber.

Installation

Installation is spent upside-down removals.

PERFORMANCE ORDER
1. Tighten a fixing cap till the demanded moment of an inhaling.
2. Establish the top support and twirl a fixing nut.
3. Establish washers and new fixing nuts.
4. Combine made before a mark and tighten fixing nuts.
5. Establish a casing into place an arrow outside.