Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. The maintenance instruction
+ 2. Maintenance service
+ 3. Engines
+ 3.2. Diesel engines
+ 3.3. Removal and a partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
- 10. Brake system
   + 10.1.2. Shock-absorbers
   + 10.2. Technical characteristics
   10.3. Prorolling of hydraulic system
   10.4. Hydraulic tubes and hoses
   10.5. Brake overlays of forward brakes
   10.6. Brake overlays of back wheels
   10.7. Brake Pads back brakes
   10.8. A brake disk of a forward wheel
   10.9. A brake disk of a back wheel
   10.10. A brake drum of a back brake
   10.11. A support of a forward brake
   10.12. A support of a back brake
   10.13. The wheel cylinder of a back brake
   10.14. The main brake cylinder
   10.15. A brake pedal
   10.16. The vaakuumnyj amplifier
   10.17. The vacuum valve of a servoamplifier
   10.18. A rope of a manual brake
   10.19. The lever of a manual brake
   10.20. The valve of adjustment of pressure in a contour of back brakes (till 96 of century)
   10.21. The switch of fires of a stoplight
   10.22. The general description of system of antiblocking of brakes (ABS)
   10.23. System ABS elements
   10.24. The vacuum pump (diesel and petrol engines in volume 2,3)
+ 11. Suspension brackets, a steering
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice


9df16362 Volkswagen Amarok

10.13. The wheel cylinder of a back brake

Removal

PERFORMANCE ORDER
1. Remove a brake drum.
2. For reduction of losses of a brake liquid remove a cap of a tank of a brake liquid and tightly close a mouth a polyethylene film or press corresponding brake hoses.
3. Disconnect the top returnable spring and take away Pads from the wheel cylinder.
4. Disconnect a brake tube.
5. Turn off two fixing bolts and remove it. The wheel cylinder is not subject to repair. If the cylinder is faulty, it is necessary to replace it.

Installation

Installation is spent upside-down removals.