Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. The maintenance instruction
+ 2. Maintenance service
+ 3. Engines
+ 3.2. Diesel engines
+ 3.3. Removal and a partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
- 8. Systems of start, ignition
   + 8.1.1. Introduction
   - 8.2. Ignition system (petrol engines)
      + 8.2.1.1. A principle of work PMS
      8.2.2. Technical characteristics
      8.2.3. Check of system of ignition
      8.2.4. The ignition coil
      8.2.5. The ignition distributor
      8.2.6. A corner of an advancing of ignition
      8.2.7. Gauges of system of ignition
      8.2.8. Бегунок the ignition distributor
      8.2.9. Ignition system (6-cylinder engines 2,6 and 2,8)
      8.2.10. Diagnostics of malfunctions of system of injection of gasoline
      8.2.11. That it is necessary to know to the owner of the car with инжекторным the engine
      8.2.12. A turbo the doctor
   + 8.3. System of prestarting heating (diesel engines)
   + 8.4. System of release of the fulfilled gases
+ 9. Transmission
+ 10. Brake system
+ 11. Suspension brackets, a steering
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice


9df16362 Відеореєстратор CARCAM Q2 все про CARCAM Q2

8.2.5. The ignition distributor Removal

ENGINES AAE, ABK, AAD AND AAR

PERFORMANCE ORDER
1. Establish cylinder N1 piston in position ВМТ.
2. Disconnect wires and a socket of connection of the gauge of the Hall from the ignition distributor.
3. Turn off fixing screws, release clips and uncover the distributor. Check up, that бегунок has been combined with a mark of cylinder N1 in the case.
4. Mark position of installation of the distributor on the block of cylinders.
5. Turn off a fixing bolt and remove the distributor. Remove a sealing ring.

THE ENGINE TO ASYA

PERFORMANCE ORDER

1. Establish cylinder N1 piston in position ВМТ.

2. Disconnect wires and a socket of connection of the gauge of the Hall from the ignition distributor.
3. Remove a filter, turn off fixing screws and uncover the distributor. Check up, that бегунок has been combined with a mark of cylinder N1 in the case.
4. Mark position of installation of the distributor on the block of cylinders.
5. Turn off fixing screws and remove the distributor. Remove a sealing ring.

Check

PERFORMANCE ORDER
1. Examine a sealing ring and replace it if it is necessary.
2. Examine a leading gear wheel and replace the distributor if it is worn out.

Installation

PERFORMANCE ORDER
1. Check up, that cylinder N1 piston was in the family way ВМТ.

ENGINES AAE, ABK, AAD AND AAR

PERFORMANCE ORDER
2. Check up, that the uvula on the leader to a shaft stood in parallel an axis of a cranked shaft.
3. Establish a new sealing ring and establish the distributor into place. Check up, that бегунок has been combined with a mark of cylinder N1 in the case, and also that marks in the case of the distributor and the block of cylinders have coincided.

THE ENGINE TO ASYA

PERFORMANCE ORDER
4. Establish a new sealing ring and establish the distributor into place. Check up, that have coincided made before a mark, and tighten fixing screws. Further installation is spent upside-down removals.