This system consists of the valve recycling, модуляторного the valve and connecting hoses.
The valve recycling and fixing bolts (the engine 1Z)
Fixing nuts of the valve recycling (the engine 1Z)
Replacement of elements
VALVE RETSIRKULJATSII
PERFORMANCE ORDER |
|
|
1. Disconnect a vacuum hose from the valve (on fig. at the left – engine AAT, on the right – 1Z). |
|
|
2. Turn off fixing bolts and remove a lining. |
|
|
3. Turn off fixing nuts and remove the valve. |
4. Installation is spent upside-down removals. |
|
|