Audi 100/A6

1990-1997 of release

Repair and car operation



Audi 100/A6
+ 1. The maintenance instruction
+ 2. Maintenance service
- 3. Engines
   + 3.1.1.2. Technical characteristics
   + 3.1.2. 5-cylinder engines
   - 3.1.3. 6-cylinder engines
      3.1.3.2. A gear belt
      3.1.3.3. A head of cylinders
      3.1.3.4. Valves
      3.1.3.5. Replacement маслосъемных caps of valves
      3.1.3.6. Check of directing valves
      3.1.3.7. Fair processing of a landing facet of a saddle / the valve
      3.1.3.8. Grinding in of saddles of valves
      3.1.3.9. Compression check
      3.1.3.10. A poliklinovoj belt
      3.1.3.11. Greasing system
      3.1.3.12. The oil pump
+ 3.2. Diesel engines
+ 3.3. Removal and a partition of engines
+ 4. Cooling system
+ 5. Heating and ventilation
+ 6. Fuel system
+ 7. An exhaust system
+ 8. Systems of start, ignition
+ 9. Transmission
+ 10. Brake system
+ 11. Suspension brackets, a steering
+ 12. A body
+ 13. An electric equipment
+ 14. A good advice


9df16362

3.1.3.10. A poliklinovoj belt

Removal

PERFORMANCE ORDER
1. Remove a casing поликлинового a belt. For this purpose turn out 2 bolts SW 10 and unfasten a casing from the screen of coils of ignition.
2. The engine with working volume 2,8 l and 30 valves (193 h.p.): Turn away the fan with вязкостной муфтой. For this purpose as a stopper insert into one of four apertures of a pulley поликлинового a belt a screw-driver and обоприте it on an arm of the fan with вязкостной муфтой. The Wrench turn on to the right (the left carving). Remove the fan.
3. Designate an arrow on поликлиновом a belt by means of a felt-tip pen or a marker a direction of its movement. The cranked shaft of the engine rotates if to look in front, to the right, that is in a direction clockwise.
4. A klinovoj belt ослабьте. For this purpose turn the tension device, as is shown in drawing, in an arrow direction ring wrench SW 15 and stop a suitable pin (Ф 6 mm), for example, AUDI-3204. Preliminary a screw-driver remove a plastic cap from a tension roller.
The prevention

At the engine capacity of 193 h.p. шестигранный a ring key of 17 mm insert under a tension roller, an arm of a tension roller turn to the right and stop.


5. A poliklinovoj belt remove.

Installation

PERFORMANCE ORDER
1. Impose поликлиновой a belt at first on приводной and directing rollers and only then on a tension roller.
The prevention

If the belt which was in the use is again established, it is necessary to pay attention to a direction of its movement. Belt installation in the opposite direction increases deterioration and can lead to its breakage. Therefore it is necessary поликлиновой to establish always a belt so that the put arrow showed in a direction of rotation of a shaft of the engine (if to look in front, in a direction clockwise).


2. Establish поликлиновой a belt on belt pulleys. Slightly press the tension device in an arrow direction. Pull out a plug-in pin. After that slowly turn натяжитель against an arrow direction, paying attention to correct position поликлинового of a belt on belt pulleys.
3. The engine capacity of 193 h.p.: the Fan with вязкостной муфтой tighten to the left the moment of 40 Nanometers.
4. Establish a casing поликлинового a belt. Establish a plastic cap on a tension roller.