Suzuki Grand Vitara SQ416/SQ420/420WD

since 1998 release

Repair and operation of the car



Suzuki Grand Vitara
+ General information
+ Maintenance and lubricant
+ Heater, ventilation and conditioner
+ Steering
+ Suspension bracket
+ Wheels and tires
+ Forward driving shaft / bearing of a shaft. Oil epiploon
+ Driveshafts
+ Brake system
+ Engines
+ Fuel system
+ System of ignition
- System of start
   + General description
   - Diagnostics
      Repair of the block
      Analysis
      Assembly
      Survey
      Work check
      Specifications
      Type of 0.9 kV
   Necessary materials
   Special tool
+ System of release
+ Transmissions
+ Coupling
+ Transfer
+ Forward and back differentials
+ Windows, mirrors, locks and security measures. Immobilizer
+ Electric equipment


9df16362

Assembly

  • It is not allowed to wash out, regulate or disassemble the shock-absorber (a clutch coupling disk).
  • New bearings without lubricant were greased when were delivered as spare parts. Do not wash out a maslorastvoritel and do not grease with other lubricant substance.

 PERFORMANCE ORDER

    Check components (see Survey) and replace on new if necessary. Apply lubricant (see the Starter). Establish an anchor on a collar. Install brushes and springs of brushes on the brush holder. Install the brush holder on an anchor, squeezing out 4 brushes outside.
1 — a brush
2 — a brush spring
3 — the brush holder
    Establish a back sleeve and then a cap of a back bracket. Establish a back bracket. Tighten brush holder screws.
1 — a back bracket
2 — brush holder screws
    Establish assembly of the obgonny coupling on a shaft - a gear wheel, paying attention to the direction of installation of a lock ring of a gear.
1 — the obgonny coupling
2 — a lock ring of a gear
3 — a persistent ring
4 — a shaft gear wheel
    Insert assembly of a shaft into a forward casing, position of the lever.
1 — assembly of the lever
2 — the lever
    Establish laying so that cuts in it were combined with openings for through bolts in a forward casing. Establish a plate and rubber consolidation in a forward casing.
1 — laying
2 — planetary transfer
3 — an opening for a bolt
4 — rubber consolidation
    Apply lubricant on a ball and establish a ball in a shaft opening.
1 — a ball
    Establish a collar, an anchor, the brush holder and a back bracket in a forward casing, having combined the marks put before removal. Tighten through bolts.
1 — bolts
2 — assembly of a reducer
    Establish assembly of the electromagnetic switch and a protector (if is). Connect a wire (to the motor) to a switch conclusion. After the end of assembly carry out a work Inspection.
1 — the electromagnetic switch
2 — a protector